Friday, May 8, 2009

the List

Ok! here it is. I apologize about the delay in this already short time frame. There were some mistakes on my behalf. As a result, our sunday night deadline will be moved to monday 12pm (5/ 11 /09) NO LATER PLEASE! We need this material for our presentation and the green light. All of our work will be either posted on the blog or emailed to me joe_serra1@yahoo.com. Adrianna, you are working with people and they may not respond in time, no prob. Just do the best with what you get/have. When all of us get this list of work finished, (by monday 12pm) the green light may be much closer than we think. Thank you! Work hard! Go Team Superfluous!

Adrianna: Budget planning, interface layout sketches, interface testing plan

Jamal: Level flow charts with maps, level layout, level sketches

Joe: Pitch presentation, pitch document, finish game music, focus group coordination

Justin: Finish up the paper/digital testBomb, mechanic flow chart

Shelby: The land dino sketches/colors, Ok, this one is going to seem long, really it's not. I just can't sum it up at the moment. I would like to see 1 extra variation of each character, (just thumbnails). Keep your ideas that you have now. Just smack them around and yell at them a bit. One last thing. If you have any info/bio on these characters (such as the zootPong! Gun, special abilities, background, or interesting educational facts) please document them.

Reminder:
Blog twice a week. Try to comment two times per each post, (short bullet posts need no comments i.e. here is my email, etc.). Thank you! Drive thru!

3 comments:

  1. Paper/digital testBomb is almost done!

    ReplyDelete
  2. I've got the bios up and posted for ya, and I'm working on coloring and scanning in thumbnails as I type this!

    ReplyDelete
  3. Roger that. Communications are in the works and I'm going to have to come up with a list of possible issues and how to fix them for my interface concepts.

    ReplyDelete